Well 6104/21-2

 

T1, 2012 (Pdf)

Pressure testing on BOP

Pressure test below BOP

HkHght & WOH PLOT

DRILLING PARAMETER LOG

FORMATION EVALUATION LOG

GAS RATIO PLOT

PRESSURE EVALUATION LOG

36in conductor cementing log

36in conductor grouting job

36in conductor run log

42in composite plot

42in spp plot

42in torque plot

20" casing cementing plot

20in casing run log

26in composite plot

26in SPP plot

26in torque plot

D+W A-Standard Roadmap_26inch hole

14in casing cementing log

14in casing run log

17.5in Composite plot

17.5in SPP plot

17.5in torque plot

D+W A-Standard Roadmap_17_5inch hole

9_ 7_8 in casing run log

9_ 7_8 in casing cementing log

12.25 Magnet vs Time

12.25in composite plot

12.25in SPP plot

12.25in torque plot

12.25in D+W A-Standard Roadmap plots

8.5 Magnet vs Time

Set 9 7_8in FAS drill squeeze packer 4021m

8.5in Composite plot

8.5in cement plug back Brugdan2 main well

8.5in SPP plot

8.5in TORQUE plot

D+W A-Standard Roadmap 8.5inch hole sidetrack

D+W A-Standard Roadmap 8.5inch hole

PandA cement plug – 221112

pressure test fasdrill packer – 221112

FIT 20in casing shoe

FIT at 14in casing shoe

Shoe treatment at 14in casing shoe

Pressure test of 9 7_8 plug

Shoe treatment  9_7_8 liner shoe

XLOT 9_7_8 liner shoe

 

Mudlogging, 2014 (Pdf)

8.5 in

MUD_LOG_TIME

WL_RAW_CALI-DEN-GR-NEU-REMP_MWD_MD_PLOT1

WL_RAW_CALI-DEN-GR-NEU-REMP_MWD_MD_PLOT2

Composite_6104_21_2_T2

Composite_6104_21_2_T3

FIT-3989m-Brugdan-2 Plot 2

FIT-3989m-Brugdan-2

FIT-4016m-Brugdan-2

8.5in_PumpRate_vs_SPP_log_6104_21_2_T2

8.5in_PumpRate_vs_SPP_log_6104_21_2_T3

Drilling_Tripping_Drag_Brugdan-T2

Drilling_Tripping_Drag_Brugdan-T3

Drilling_Tripping_Torque_Brugdan-T2

Drilling_Tripping_Torque_Brugdan-T3

Metal Recovery-Brugdan-T2

Metal Recovery-Brugdan-T3

Mud use vs depth-Brugdan-T2

Mud use vs depth-Brugdan-T3

Mud use vs time-Brugdan-T2

Mud use vs time-Brugdan-T3

Pressure_Flow_ECD_vs_Depth_Brugdan-T2

Pressure_Flow_ECD_vs_Depth_Brugdan-T3

8.5in_Torque_plot-6104_21_2_T2

8.5in_Torque_plot-6104_21_2_T3

6104_21_2_T2_DPL_corrected

6104_21_2_T2_FEL_corrected

6104_21_2_T2_GRL_corrected

6104_21_2_T2_PEL_corrected

6104_21_2_T3_DPL_corrected

6104_21_2_T3_FEL_corrected

6104_21_2_T3_GRL_corrected

6104_21_2_T3_PEL_corrected

 

MWD-LWD, 2014 (Pdf)

T2

Composite

WLC_COMPOSITE_1_INF_1

WLC_COMPOSITE_1_PLOT_1

WLC_PETROPHYSICAL_COMPOSITE_1_INF_1

MWD Run 4

MUD_LOG_TIME

WL_RAW_CALI-DEN-GR-NEU-REMP_MWD_MD_PLOT1

WL_RAW_CALI-DEN-GR-NEU-REMP_MWD_MD_PLOT2

T3

Composite

WLC _COMPOSITE_1_PLOT_1

WLC_COMPOSITE_1_INF_1

WLC_PETROPHYSICAL_COMPOSITE_1_INF_1

MWD

Run 6

DrillingMech-APWD_Time_Run6

VISION_Resistivity_200MD

VISION_Resistivity_500MD

VISION_Resistivity_500TVD

Run 7

DrillingMech-APWD_Time_Run7

 

Wireline T2 (Pdf)

                      Statoil_West_Hercules_Brugdan_II_6104_21-2_T2_Swetech